This is an example scenario, not a customer deployment. It shows how x101 capabilities apply to this kind of work. There are no customer-attributed figures on this page; outcome numbers are published only once they are measured in a live deployment. For deployments running today, see the production case studies.

01

The challenge

Rolling out radio sites at scale is limited less by hardware than by the configuration work around it. Every device needs settings derived from the plan, matched to its vendor and generation, checked against the live network, and recorded, and today most of that is careful manual work under time pressure.

  • Configuration written by hand, site by site

    Engineers derive parameters from planning documents for every device, which is slow and produces variation between sites that should be identical.

  • Every vendor does it differently

    A multi-vendor estate means multiple command sets, templates and conventions, and the knowledge of each lives with a handful of specialists.

  • Errors found after the crew has left

    Mistakes surface during commissioning or after go-live, when fixing them means another visit and another maintenance window.

  • Records assembled after the fact

    What was configured, by whom and against which plan version is reconstructed later, which makes rollout audits slow.

02

What x101 does

The same platform capabilities that run in production elsewhere, applied to this work. Each step below is standard platform behaviour, not custom development.

Step 01

The plan, read directly

x101 reads the design and planning output alongside inventory and the current network state, so the intended configuration and the live reality sit in one picture.

Step 02

The configuration, generated

Device settings are drafted from approved vendor templates and past commissioned sites, with every value traceable to the plan or the standard it came from.

Step 03

Validated before it ships

Parameter conflicts, neighbour relationships, capacity assumptions and policy rules are checked against the live network before anything is sent to a device.

Step 04

Commissioned under approval

The approved configuration is applied through the operator's own automation, inside blast-radius limits, with every action logged and reversible.

Step 05

Verified on air

Post-commissioning checks confirm the site is behaving as designed, and anything outside tolerance is raised as an exception with the evidence attached.

Step 06

Each site teaches the next

Corrections, overrides and commissioning outcomes feed back into the templates, so the generated configuration improves with every rollout.

Governance runs across every step. Each request carries the permissions of the person asking, actions follow the policies you set, high-impact steps wait for human approval, and every decision is written to a signed, replayable record.

03

What gets measured

These are the measures a deployment of this scenario is held to. Figures are published on this page once a live deployment has produced them.

Baseline and target

Agreed before the first week

  • Elapsed time from installation to carrying live traffic
  • Share of sites commissioned without a repeat visit
  • Configuration errors caught before they reach a device
  • Engineer hours per commissioned site
How rollout works

A first use case live in weeks

  • Inside your perimeter. Your cloud, your access controls and your data, from day one.
  • Works with what you run. x101 reads the systems you already have, as they are today.
  • Paired with a solutions engineer. Someone who has deployed this before works alongside your team.
  • Measured against your baseline. The numbers that matter are agreed up front and reported against.